SciELO - Scientific Electronic Library Online

 
vol.25 número44Propuestas de control de acarreos en Ruta Nacional 40. Lago Guillelmo-Bariloche índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Revista

Articulo

Indicadores

Links relacionados

  • No hay articulos similaresSimilares en SciELO

Compartir


Infraestructura Vial

versión On-line ISSN 2215-3705versión impresa ISSN 2215-3705

Resumen

RAMIREZ MEDINA, Daniel Alexis  y  VALENZUELA ROBLES, Luis Segundo. Periodic maintenance plan for the pavement in the busstop Las Retamas - Los Angeles bridge section. Infraestructura Vial [online]. 2023, vol.25, n.44, pp.119-132. ISSN 2215-3705.  http://dx.doi.org/10.15517/iv.v25i44.51309.

The general objective of this study was to design a periodic maintenance plan for Paradero Las Retamas - Puente Los Angeles section of the Central highway, developed in 2021. For this purpose, a quantitative, descriptive, non-experimental, cross-sectional approach methodology was applied to a sample population of 1,9 km distributed in 13 sampling units of 230,42 m2, to which the Pavement Condition Index (PCI) was determined according to its own methodology. A traffic study was also conducted to determine the composition and classification of vehicles, and the drainage system was inspected to identify the current pavement conditions. In addition, physical properties were analysed through laboratory tests to determine the International Regularity Index (IRI) and the Present Serviceability Index (PSI), considering the stipulations of the Ministry of Transportation and Communications (MTC).

Finally, the information was processed using HDM-4 software to determine the most appropriate periodic maintenance strategies. In this way, an overall PCI of 62 was obtained, qualified as "good", and an Average Daily Annual Index (IMDA) of 31 236 vehicles/day, which classifies the road as a first-class highway. On the other hand, the most viable maintenance alternative was a simple surface treatment, accompanied by the uniform application of a layer of bituminous binder on the granular pavement, combined with an optimal routine maintenance. The evaluation criteria show the profitability of the project, showing a Net Present Value (NPV) of 3,20 million soles (844 804 USD) and an Internal Rate of Return (IRR) of 20 %. Finally, a positive impact on the PSI is obtained as a result of the implementation of the alternative.

Palabras clave : PCI; IMDA; highway; HDM-4; road maintenance.

        · resumen en Español     · texto en Español     · Español ( pdf )